G19009

Hamad Port Medical Centre Fit-out

3 stars logo
Project Details

The proposed project is located in the NPP-0073 package. The project scope is fit-out of the medical center PF 12.7.1. Medical Center at NPP0073. QGL has been commissioned to comply the Minimum 3-Star Rating for all the material & construction of the fit-out scope of work, in accordance with already issued GSAS “Letter of Conformance” (Ref: LOC/QA0106-0107 dated 7 March 2016, GSAS ID PD-QA-0048-0048/15) and the requirements of the associated prescriptive checklist for the building.

Project Owner:

Hamad Port Project

Main Consultant:

AECOM

Main Contractor:

Salam Enterprises

Facility Manager:

N/A

Date Started:

January, 2019
Performance Indicators
Urban & Site Performance
50%
Energy Performance
50%
Water Performance
50%
Materials Performance
50%
Indoor Environment Performance
50%
Management & Operation Performance
50%
Other Performance
50%

* Rough % estimates comparing to standard buildings

Green Building System:

Rating System:

Certification Level:

Site Area:

N/A

Built-Up Area:

N/A

Status:

Ongoing

Date Certified:

—-
Project Gallery
Project Location
Comment?

Leave a Reply

Your email address will not be published. Required fields are marked *