L18203

Msheireb Downtown Doha Project Phase – 1B

Project Details

Phase 1B consists of three clusters of Qatari townhouses and retail area. Block H05 has a retail area on the Ground Floor and has three and four bedroom units. Blocks H03 and H09 consist of two and three bedroom Qatari townhouses.

Blocks I02, I08 & I09 are three clusters of townhouses. Each cluster has four to five townhouses with a Communal Majlis Building. The townhouses vary in sizes from five to seven bedrooms spread across the three upper floors.

The Cultural Forum Building consists of ground plus six floors including a 500 seat theatre, cinemas, academy for performing arts, library, art galleries with sculpture courts, sky theatre, fine dining restaurant, cafe and retail.

Project Owner:

Msherieb Properties

Main Consultant:

Gensler, CEG

Main Contractor:

Tyeseer-CCC JV (TCCC)

Facility Manager:

N/A

Date Started:

October, 2018
Performance Indicators
Urban & Site Performance
50%
Energy Performance
50%
Water Performance
50%
Materials Performance
50%
Indoor Environment Performance
50%
Management & Operation Performance
50%
Other Performance
50%

* Rough % estimates comparing to standard buildings

Green Building System:

Rating System:

Certification Level:

Site Area:

Approx. 40000 m2

Built-Up Area:

Approx. 10000 m2

Status:

Ongoing

Date Certified:

—-
Project Gallery
Project Location
Comment?

Leave a Reply

Your email address will not be published. Required fields are marked *